The R-9702 Concrete Bollard features tapered verticals and a domed top. It has a wide ornamental collar and slim relief bands for added texture. Concrete bollards are reinforced with epoxy-coated steel rebar, and use high-pressure cement to ensure the best strength and durability against chipping and wear. Exposed aggregate finish features British Columbia granite. Install bollards by embedding rebar extensions in wet concrete—or use adhesive to secure into pre-drilled holes. Bollards ship standard with 6-inch rebar extensions and drilling template. Custom rebar lengths available.
[Any Division 32 Section with "Bollards" in the title or Section 32 41 00 “Bollards” for bollards other than precast concrete bollards specified herein.]
REFERENCE STANDARDS
ASTM C666 - Standard Test Method for Resistance of Concrete to Rapid Freezing and Thawing.
ASTM C825 - Standard Specification for Precast Concrete Barriers.
ASTM C979 - Standard Specification for Pigments for Integrally Colored Concrete.
SUBMITTALS
Comply with Section [01 33 00 – Submittal Procedures.] [_________.]
Product Data: Provide for each type of bollard specified.
Color Samples: [Submit manufacturer’s standard colors for selection.] [Submit sample of color specified.]
Maintenance Data: Submit manufacturer’s field touch-up, cleaning, and maintenance instructions.
Warranty Documentation: Submit sample of manufacturer’s warranty.
QUALITY ASSURANCE
Comply with Section [01 43 00 – Quality Assurance.] [_________.]
DELIVERY, STORAGE, AND HANDLING
Comply with Section [01 66 00 – Product Storage and Handling Requirements.] [_________.]
Protect bollards and accessories during delivery, storage, and handling.
Examine paving or other substrates for compliance with manufacturer’s requirements for placement and location of embedded items, condition of substrate, and other conditions affecting installation of bollards.
Proceed with installation only after unsatisfactory conditions have been corrected.
INSTALLATION
General: Comply with manufacturer’s installation instructions and setting drawings.
Do not install damaged, cracked, chipped, deformed, or marred bollards. Field touch-up minor imperfections in accordance with manufacturer’s instructions. Replace bollards that cannot be field repaired.
Direct Imbed: Support bollard during concrete placement and cure.
CLEANING & PROTECTION
Protect bollards against damage.
Immediately prior to Substantial Completion, clean bollards in accordance with manufacturer’s instructions to remove dust, dirt, adhesives, and other foreign materials.
Touch up damaged finishes according to manufacturer’s instructions.
CLOSEOUT ACTIVITIES
Provide executed warranty.
END OF SECTION
Copyright 2020 by Reliance Foundry Co. Ltd.; qualified design and construction professionals may copy for preparation of construction specifications and purchase orders for Reliance Foundry products.